Located on the corners of Hwy 82 and Basalt Ave this project had many safety measures in place for traffic and pedestrian safety. Highway 82 is heavily traveled as is the pedestrian walkway , so our team had to be aware at all times of their surroundings and keep safety a priority. The use of heavy equipment was not always an option so many of the beds were labor intensive.